ATAC LogoAdvanced Traffic Analysis CenterSkip Navigation

Traffic Operations
Completed Projects

2009

2008

2007

2006

2005

  • 13th Ave. S. and Sheyenne St. Signal Coordination: West Fargo, ND
  • I-94 Work Zone Surveillance/Construction Sign Inventory and Analysis
  • User Cost Analysis of I-29 Reconstruction (2006): Fargo, ND
  • Traffic Analysis Study I-94/US 281 Interchange: Jamestown, ND
  • Pedestrian Data for Three Crosswalks: Fargo, ND
  • Driving Behavior Analysis at 1st Ave. S. & 9th St. S.: Jamestown, ND

2004

2003

2002

2001

2000

  • Operational Analysis of 25th St.: Fargo, ND
  • Operational Analysis of 13th Ave. (focus on 6th St. E. and 17th St. E.): West Fargo, ND
  • Operational Analysis of 1st Ave. N.: Moorhead, MN and Fargo, ND
  • F-M Helmet and Pedestrian Study: Fargo and West Fargo, ND, and Moorhead, MN
  • Operational Analysis of 32nd Ave. S. near Flying J: Fargo, ND

1999