ATAC LogoAdvanced Traffic Analysis CenterSkip Navigation

Traffic Operations
Completed Project

Sheyenne St. & I-94 Interchange Simulation Analysis: West Fargo, ND

Completed March 2008
The Sheyenne St. and I-94 Interchange has been experiencing increased traffic congestion during the peak-hour periods, especially during the morning (AM) peak period. Another interchange along I-94 has been approved at 9th St./57th St., which is one mile east of Sheyenne St., and will be operational by 2009. This study will analyze the existing traffic conditions (2007) of the Sheyenne St. & I-94 Interchange, as well as the projected conditions of 2010. Both the AM and PM peak periods will be evaluated using the CORSIM traffic simulation model.

Keywords: West Fargo, traffic congestion, traffic simulation, CORSIM

Final Report
(PDF, 2565K)