ATAC LogoAdvanced Traffic Analysis CenterSkip Navigation

Traffic Operations
Completed Project

User Cost Analysis of I-29 Reconstruction in Fargo

Completed January 2001
ATAC conducted a detailed analysis of potential impacts of the I-29 construction activities in Fargo. The analyses included estimating user costs due to the construction along the corridor as well as possible alternative routes. A network consisting of I-29 as well as alternative routes was constructed in the VISSIM traffic simulation model. The network contained over 60 signalized intersections. Traffic volumes were varied based on ranges of traffic diversions from I-29.

For more information, e-mail shawn@atacenter.org or ayman@atacenter.org
Keywords: Fargo, User costs, Construction impacts, VISSIM

Final Report (User Cost Analysis of I-29 Reconstruction in Fargo)
(PDF, 485K)