ATAC LogoAdvanced Traffic Analysis CenterSkip Navigation

Metropolitan Transportation Planning
Completed Project

Analysis of Traffic Operations at the I-94/US281 Interchange in Jamestown

Completed August 2005
The purpose of this study is to assist the NDDOT in evaluating current traffic operations at the I-94/US 281 Interchange. The main emphasis of this project is assessing traffic maneuvers from two exit ramps and how they interact with through traffic along US 281. The assessment includes traffic operations, safety, and geometric measures. ATAC's video-based traffic data collection system is being used to collect field data which are being analyzed in the lab.

For more information, e-mail shawn@atacenter.org
Keywords: